| Environment Studies | |||||
| # | Client | Name of Project and Location | Services Performed | From | To |
| 1 | Applied Advance Technology USA | Removal and Proper Disposal of Hazardous Waste - Saudi Arabia | Identification of the types of hazardous waste material stored in Saudi desert and determining the proper disposal process as per United States Environmental Protection Agency (EPA) and Saudi Arabia Maiorology and Environmental Protection Agency (MEPA). | March 1998 | June 1999 |
| 2 | Saudi-French Offset Program Saudi Arabia | Recycling and Reclamation of Solid Waste - Saudi Arabia |
Feasibility study for a plant to recycle and reclaim the solid waste collected annually in Saudi Arabia urban centers. The designed plant would treat500,000 tons/year of paper, plastic, glass, aluminum, metals and composite. Worked closely with Thomson CSF, Safe International and Al-Bilad Establishment of Saudi Arabia and other specialized European and North American environmental groups. | April 1998 | March 1999 |
| 3 | Therm All Inc. USA | Hazardous Industrial Waste Disposal - Saudi Arabia | Technical evaluation of methods and suitable process for safe disposal of hazardous industrial wastes of varying types of streams derived from a major industrial area in Saudi Arabia. | December 1994 | March 1995 |
| 4 | CIServ Environment Sweden | Marine Pollution Monitoring and Contingency Plan for Major Ports -Saudi Arabia | Provided technical assistance for development of a contingency plan for oil and chemical marine pollution in the Arabian Gulf and Red Sea ports. Assisted in setting the logistics, sourcing and maintenance of pollution fighting equipment. Prepared the audio-visual and seminar material for training of SEA PORTS staff and technicians. | March 1997 | June 1998 |
| 5 | Norpol Marine Services Norway | Oil Spill Protection of Desalination Plant, Sea Water Intake Channel - Saudi Arabia | Collaborated with a Scandinavian firm for the design and procurement of oil spill protection system. The system included detection and early warning hydrocarbon oil contamination, physical barriers, cleaning and skimming, equipment and on-land handling facility. The system was devised to protect the desalination plant intake against accidental oil leakage and spills. The design study was conducted in close cooperation with E. Blonberg AB in Gothenburg, Sweden. | November 1998 | April 1999 |
| Publications | Partners / Associates | The Monthly | Information International Research Consultants Martyrs Square, Al-Borj (An-Nahar) Bldg., 4th Floor P.O. Box: 11-4353 Beirut, Lebanon Tel: + 961-1-983008/9 Tel: + 961-3-262376 Fax: + 961-1-980630 Email: infointl@information-international.com |